Predetermined Overhead Allocation

Calculate using the labelled inputs: Predetermined Overhead Allocation.

Predetermined cost per allocation unit
20
Overhead allocated to the job
200.00
Total overhead applied in the period
12000.00
Applied minus actual overhead
1000.00

Calculation and assumptions

rate=budget/estimated_units; job=rate·job_units; applied=rate·actual_units; variance=applied−actual_cost.

Choose one allocation basis such as machine-hours and use it consistently. Budgeted units must be positive. The rate is not rounded before allocation; job and total amounts each round once to cents, halves away from zero. Positive variance means overapplied overhead, negative means underapplied. No accounting policy is selected. In one chosen two-decimal currency; no taxes or current market rates are supplied.

Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.

Frequently asked questions

How is the result calculated?

rate=budget/estimated_units; job=rate·job_units; applied=rate·actual_units; variance=applied−actual_cost.

What assumptions apply?

Choose one allocation basis such as machine-hours and use it consistently. Budgeted units must be positive. The rate is not rounded before allocation; job and total amounts each round once to cents, halves away from zero. Positive variance means overapplied overhead, negative means underapplied. No accounting policy is selected. In one chosen two-decimal currency; no taxes or current market rates are supplied.

How precise are the results?

Monetary totals use two decimal places, with exact halves rounded away from zero at the steps described. Ratios and other numbers show up to ten significant digits. Display precision does not improve input accuracy. Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.

Also try:

Back to category →